THE CITY OF RED BAY, ALABAMA

Request for Quotes

Third Avenue South and Sixth Street West

Paving Project

Water Works and Sewer Board of the

City of Winfield, Alabama

AMR METER PROJECT

DWSRF Project No. FS010243-01

CONTRACT “A” - (MATERIAL ONLY)

Water Works and Sewer Board of the

City of Winfield, Alabama

AMR METER PROJECT

DWSRF Project No. FS010243-01

CONTRACT “B” - (INSTALLATION ONLY)

Remlap - Pine Mountain Water Authority

Booster Station

FS010119-02

The Sewage Disposal Board

of The City of Red Bay

Red Bay Sanitary Sewer Improvements Project

8th Street Sewer Line Extension

ARC Project No. AL-19536

THE CITY OF MARION, ALABAMA

Request for Quotes

Fluoride Equipment

THE CITY OF COLUMBIANA

City of Columbiana County Shop Lift Station Replacement

‚Äč

Water and Sewer Board

of the Town of

Hurtsboro, Alabama

HURTSBORO SEWAGE LIFT STATION REPLACEMENT

1. Replace or Rehabilitate the Eight (8) Sewage Lift Stations.
2. Bypass Pump Around Station.
3. Manholes.
4. 8" C900 PVC Sewer Pipe

THE CITY OF JACKSONVILLE

Water Works, Gas & Sewer Board

Sewer Rehabilitation at Highway 21 from

5th Street NE North for 800 Feet - JPWP19-103

1. 800 LF 10" Pipe Burst to 10" Pipe
2. 800 LF TV and Inspect

THE CITY OF JACKSONVILLE

Water Works, Gas & Sewer Board

CDBG PROJECT NUMBER: LR-CM-PF-18-022

1. 6,000 LF Clean 6” – 8” Sanitary Sewer

2. 6,000 LF Video 6” – 8” Sanitary Sewer
3. 4,000 LF Pipe Burst 6” – 8” Sewer Pipe

4. 72 VF Install New Manholes
5. 8 EA New Manhole, Frames and Covers

6. 3 EA Raise Manholes

THE CITY OF

LINCOLN, ALABAMA

City of Lincoln Tank Coating and Repairs

1. Tank 1 Standpipe, 200,000 Gallons, 39'-6" High,

    Clean and Coat Interior and Exterior, and make repairs
2. Tanks 2 Elevated Tank, 500,000 Gallons 129'-6" High,

    Clean and Coat Exterior with containment, and make repairs

THE CITY OF

LINCOLN, ALABAMA

Meter Replacement Contract “A”- Material

Project Number LIN 19 062A

1. 4,200 Cellular Water Meters
2. 200 Meter Boxes
3. 500 Check Valves
4. 500 Curb Stops

THE CITY OF

LINCOLN, ALABAMA

Meter Replacement Contract “B”- Installation

Project Number LIN 19 062B

1. 4,200 Cellular Water Meters
2. 200 Meter Boxes
3. 500 Check Valves
4. 500 Curb Stops

LINEVILLE, ALABAMA

LINEVILLE WATER WORKS AND SEWER BOARD
AMR METER PROJECT

CONTRACT “A” - MATERIAL

LINEVILLE, ALABAMA

LINEVILLE WATER WORKS AND SEWER BOARD
AMR METER PROJECT

CONTRACT “B” - INSTALLATION

THE CITY OF MARION, ALABAMA

City of Marion Road Resurfacing Project

1. Tack Coating
2. Milling
3. Wearing Surface, Leveling and Patching
4. Traffic Stripping
5. Traffic Control Markers
6. Manhole Cover Reset
7. Valve Box Reset

THE CITY OF MARION, ALABAMA

REQUEST FOR QUOTES

PROPOSED CONCRETE SIDEWALK CURB AND
GUTTER INSTALLATION

THE CITY OF MARION, ALABAMA

REQUEST FOR QUOTES

PROPOSED CHAIN LINK FENCE INSTALLATION

THE CITY OF RED BAY, ALABAMA

REQUEST FOR QUOTES
EMERGENCY REPAIR FOR
ROAD AND DRAINAGE STRUCTURES

THE TOWN OF MULGA

Mulga Water System Contract "A"

AMR Water Meter Project - Material

DWSRF Project No. FS010249-01

1. Furnish (Only) Approximately 2,100 AMR Meters

2. Furnish Data Collection Unit
3. Furnish Ancillary System Support and Start-Up

4. Furnish Applicable Software

THE TOWN OF MULGA

Mulga Water System Contract "B"

AMR Water Meter Project - Installation

DWSRF Project No. FS010249-01

1. Install (Only) Approximately 2,100 AMR Meters

2. Install Approximately 500 Meter Boxes
3. Install (Only Backflow Valves

4. Install (Only) Curb Stops

THE CITY OF RED BAY

Contract “A” - West Franklin Industrial Park Sewer and Storm Drainage Project

1. 850 LF of 8” SDR 26 Gravity Sewer Line

2. PVC Storm Piping with Inlet Boxes and Grates
3. Detention Pond (Site Work)

4. Fencing
5. Three New Sewer Manholes

THE CITY OF RED BAY

Contract “B” - West Franklin Industrial Park Sewer and Storm Drainage Project

1. Road Widening

2. Striping
3. Asphalt Resurfacing

THE TOWN OF MULGA

Mulga Water System

AMR Water Meter Billing System

DWSRF Project No. FS010249-01

Bid Tab

THE CITY OF PIEDMONT

WASTEWATER SYSTEM IMPROVEMENTS

CDBG PROJECT NUMBER:

LR-CM-CF-18-010

THE CITY OF MARION

URGENT NEED PROJECT CONTRACT “B”

CDBG PROJECT NUMBER:

LR-SF-PF-09-102/LR-SF-PF-11-102/LR-SF-PF-14-102

Bid Tab

City of Red Bay, Alabama

Red Bay Fun Park Improvements Project

LWCF Project No. 17-LW-1049

Russellville, Alabama

The Russellville Water and Sewer Board

Proposed Ultraviolet Disinfection Upgrade

for the Radford "Joe" Murray

Wastewater Treatment Plant
CWSRF PROJECT NO. CS010876-01

City of Winfield

Proposed Winfield Industrial Park

Sewer Extension

CDBG Project No. LR-ED-PF-17-012

City of Red Bay

Bay Tree Park

Bay Tree Park Renovations

© 2023 by UEC. Proudly created with Wix.com